Interior Renovation
Banff, AB
2019
John Dowson Construction
Interior Renovation
Banff, AB
2017
John Dowson Construction
2017
Morden Research Centre,
Building #72
Morden, MB
completed with CKAID
JC Wilt Building
Winnipeg, MB
New Fork Lift Pad for Penthouse Access
2016
completed with CKAID
Lower Fort Garry Stone Wall Rehabilitation
Selkirk, MB
2018
Winner of the Manitoba Masonry Award for Historic Rehabilitation
completed with CKAID
Gavin was responsible for developing and implementing a strategy to address the deteriorating limestone walls and bastions at Lower Fort Garry in order to extend the life cycle of the historic asset. Guided by the conservation principles of minimal intervention, reversibility and using the gentlest means as possible, the rehabilitation work included the replacement of 100% of the existing copings (650m), 35% of wall mortar, and 5% of wall stone. The work then included the introduction of a new Tyndall stone coping complete with overhang and drip edge to protect the walls from freeze/ thaw cycles; carefully selected mortar mixtures; installation of ‘natural’ bedded fieldstones to replace ‘face’ bedded fieldstones; and naturally occurring vertical cracks were accepted as an inherent element of the walls and carefully designed control joints were installed at these locations to accommodate movement and limit the potential of water from penetrating the wall system. All new interventions were selected to ensure the masonry work would provide technical performance, be aesthetically compatible and subtly distinguishable.
Lethbridge Research Centre
Feed Barn Rehabilitation
2017
completed with CKAID
Canada Revenue Agency
Door & Kitchenette Upgrades
Winnipeg, MB
2016
completed with CKAID
Lethbridge Research Centre
Dairy Barn Roof Replacement &
Hazmat Abatement
2017
completed with CKAID
Trout Building Interior &
Exterior Upgrade
Estevan, SK
2016
completed with CKAID
Airdrie Agriculture Regional Centre
Airdrie, AB
2014
Agriculture and Rural Development
Food Safety and Animal Health Division
Alberta Infrastructure
completed with CKAID
Assiniboine Unit Upgrade
Saskatoon, SK
2013
completed with CKAID
Lethbridge Correctional Centre
Lethbridge, AB
2013
completed with CKAID
Calgary, AB
2012
completed with CKAID
Stony Mountain Institution, MB
Edmonton Maximum Security Institution, AB
2016
completed with CKAID
Lethbridge Correctional Centre, AB
2012
completed with CKAID
Saskatchewan Penitentiary
Building B-2
Prince Albert, SK
2011
completed with CKAID
Saskatchewan Penitentiary
Building C-22
Prince Albert, SK
2011
completed with CKAID
Regional Psychiatric Centre
Prison Hospital Addition & Renovation
Saskatoon, SK
2009
completed with CKAID
Castlegar Airport, BC
2005
completed with CKAID